Ardrishaig swing bridge resurfacing

Want to read more?

We value our content  and access to our full site is  only available on subscription. Your subscription entitles you to 7-day-a-week access to our website, plus a full digital copy of that week’s paper to read on your pc/mac or mobile device In addition your subscription includes access to digital archive copies from 2006 onwards

Already a subscriber?
Subscribe Now

BEAR will resurface a section of the A83 on the approach to the Ardrishaig Swing Bridge on Tuesday night.

The works postponed, due to poor weather earlier this year, start at 8pm, with a 10mph convoy system for the first hour as teams remove the old surface.

From 9pm, an overnight road closure will be in place, for safety while resurfacing, as the operation will block the single carriageway across the Ardrishaig swing bridge.

There is no suitable diversion route for trunk road traffic. Vehicles will be stacked on each approach to the site and escorted through at approximately one-hour intervals.